How do core concepts map to Tenzo?
Key: ✅ Supported 🚸 Work in Progress ❌ Not supported
Location |
✅ Workspace |
Shift (actual) |
✅ Clocktimes |
Shift (planned) |
✅ Planned shifts |
Hours |
✅ Hours |
Salaried workers |
✅ Salaried workers |
Employee |
✅ Employee |
Role |
✅ Employee function |
House Part |
✅ Clocktimes Work area |
Overheads |
✅ Exact match / Flat percent |
Holiday |
❌ Not supported |
Breaks |
✅ Planned shifts |
Overtime |
🚸 Planned shifts (set to 0) |
Exception costs / one-off costs |
❌ Not supported |
Borrowed / loaned employees |
❌ Not supported |
Data Ingestion
Real-time optionally available? |
✅ Every 10 minutes |
Default polling frequency |
Every 8 hours |
Data retrieved on each poll |
Two weeks on either side of selected date |
Historical data |
All data since you started using the system |
How do I connect this data to Tenzo?
Strobbo can be connected directly inside of the Tenzo app. You'll need to have:
- An API key from Strobbo
- A date to start pulling data from
- An hourly rate override if specified in Strobbo. This is a Strobbo specific concept.
Please contact your Customer Success Manager, who will connect this for you.
How do I compare Strobbo data to data in Tenzo?
Matching to Strobbo's Reporting Module
If you have access to Strobbo's Reporting Module, then go to the Left-side Menu > Reporting:
Select Location and Date Range > the first chart you will see is Turnover per personnel cost; here, refer to the line displaying "Staff costs":
In Tenzo, go to Labour > Location > Trends > Visualise by Day > select Location > select date range.
Strobbo's "Staff Costs" = Tenzo's "Actual Cost of Labour"
Matching to Strobbo's Planning Module
If you do not have access to Reporting, you can go to Schedule > Planning > Select the week you want:
Then click on the currency symbol on the right hand side, then select Verify against "Actual":
The numbers you should look at are the ones on the left-hand side of "Staff Cost":
This matches to Tenzo with overheads and salaried employees included:
Exceptions
- If a change is made to the hourly pay rate then this change applies to the current week/future labour costs. However if you view past labour costs on the Reporting page on Strobbo, this page will re-calculate past labour costs using the current hourly pay rate. This re-calculated data then may not match with Tenzo.
#integrations #labour
Comments
0 comments
Please sign in to leave a comment.